Product Details:
| Minimum Order Quantity | 1 Square Meter |
| Service Location | Pan India |
| Location Type | Commercial |
| Material Procurement | Customer End |
| included | ALL required service |
Pool construction in 31 days, without RCC, tiling and plumbing.
Swimming pool construction generally involves site preparation, excavation, structural work (plumbing, electrical, concrete), and finishing (tiling, decking, etc.). The process starts with choosing a suitable location and design, followed by excavation, and then building the pool structure. Finishing touches like tiling, decking, and coping complete the project.